Changes
What changed, and why figures moved
This build: code 70ff859 · data 2026-11-23 · defaults fa9fed · built 2026-11-24T05:37Z
Every release, newest first, with the three versions a figure depends on. Code is the git commit the site was built from. Data is the date the published data was built (each page says so). Defaults is a short fingerprint of the hand-set default assumptions (the registry on the Assumptions panel); figures read from refreshed data, such as the gas price and the price indexes, follow the data version instead. When a figure on a page moves, compare the three versions in the sidebar foot (or on any printed page) with the ones you saw before: only the parts that changed can explain it. Each entry's "Default changes" says what moved a headline figure, and why.
Entries before 2026-11-22 were written afterwards from the commit history and the QA records kept with the code; their defaults fingerprint was not recorded at the time.
Ask AI result tables in plain words
Changes
- A result shown in an Ask AI answer leads with its headline figures: for a cost answer, the cost of power range as one figure ("89.4 to 130 2025 C$/MWh, scenario range …"), then the gas need, energy, emissions, capital and tie-ins. It had led with "Headline cost of power per mwh · Lo", a "Reading order" note written for the assistant, and internal ids, which no longer show. Units and initialisms keep their case (MWh, GJ, IRR).
Carbon on gas engines counts their methane
Changes
- TIER prices a plant's emissions, and sets its benchmark, in CO2 equivalent. Gas engines were charged on their CO2 alone. They now also carry the methane that passes through them unburned and their nitrous oxide. The figure is from the filed Alberta engine plant the engine heat rate already comes from (Beacon Heartland, IAAC 90123, Table 23.1.1): 3,004 kt of CO2 and 4,401 kt CO2e a year. Found by an independent recompute of the site's figures against each publisher's own files; the other figures checked matched.
- The carbon section says how much of a plant's emissions is CO2 and how much is methane and nitrous oxide. A plant type with no figure says its emissions are CO2 only.
- The plant-type table prices each type on its own figure, not the chosen plant's.
- Delete my account, in Settings: deletes the account's saved work in the cloud, its Ask AI chats, sign-up answers, problem reports, API access and keys, and the sign-in itself. Visit counts already recorded stay, without the account on them, as the privacy policy says.
- Ask AI keeps answering when its model is busy. On 24 November the AI service answered "busy" for its model for over an hour and every question failed after a minute with a bare error. The assistant now moves at once to the same model under its other name, then to its slightly cheaper predecessor (both checked on the assistant's test questions), and finishes within the site's one-minute limit: it stops calling tools in time to write the answer, and says plainly when it could not.
- Ask AI shows the default values when it asks whether you have your own inputs (plant, capital, gas price, cost of capital, life), so you can see what you would be replacing.
- kW and kV in Ask AI answers read as written; they had been printed "k w" and "k v".
- Land sale medians on few sales say so. A by-play median resting on fewer than 30 sold parcels is marked "few sales", and the table says such medians describe those sales, not a price for rights in that play (Crown land sales page, place pages, land value range).
- Every number box says when a value is out of range. The coverage scenario's term, start year, set-aside, decline, AECO price, load factor and transport toll took any number; they now have ranges and say when they cap or raise one. A value under a box's least (0 for the life, 1 for the lateral diameter) says so while it is typed, not only once the box is left; "1 year", not "1 years".
- /screening, /screen, /siting and /well-review open the map lens of that name instead of "page not found". The sitemap lists only pages that answer themselves.
- This page says an entry is in this build, not "not yet deployed", when the site running it already has it. Developers says early access by request, not "coming soon".
- "You're offline" only when you are. Some browsers report being offline while every page loads (Chrome on a Mac with a VPN, for one). The notice, and the held links, now wait until a request to the site also fails.
Default changes
- Methane and nitrous oxide for gas engines (0f4a27 → c5d4fe): from 0 (not included) to 0.0234 t CO2e per GJ of fuel. That is (34.1 kt CH4 × 28 + 1.67 kt N2O × 265) over the 59.7 PJ of fuel the filing's CO2 implies. The filing uses federal default factors with no removal, so this is the high side for a modern lean-burn engine; enter the maker's measured slip to replace it. Turbines and combined cycle stay at 0: they burn their methane almost completely, and no public Alberta filing gives a figure for them.
- What moved, Fox Creek at 100 MW of engines: - Emissions: 345 → 506 kt CO2e a year. - Carbon: 11.5 → 31.8 C$/MWh levelized. - Cost of power at today's gas price: 63 → 84 C$/MWh. - Headline range: 67–108 → 87–128 C$/MWh. - The returns fall too, since each MWh carries more carbon. Gas need, capital and O&M are unchanged.
- Spare capacity is a saved input (c5d4fe → fa9fed). It was a box on the place page alone: not saved, not listed under "Changed from defaults", untouched by reset, and costed as none by the API, Compare and reports whatever the box said. It is now an input like the others, still none unless you enter it, so no figure moves.
Versions, licences and the model inventory
Changes
- The sidebar foot, every printed page and every API response (the
X-PatchWatt-Versionheader) now carry three versions: code, data and defaults. Before this, the only stamp was the data build date, which stayed "2026-11-19" through two releases that changed figures. - New pages: this list of changes, the model inventory, licences and permissions for every dataset, and about PatchWatt (versions, accessibility, the services the site relies on, and how it is run).
- The Government of Alberta Major Projects inventory is now in the dataset register as restricted: its site offers no open licence, so reuse needs the Government of Alberta's permission. The app keeps showing it while permission is asked for, with a permission note on the major projects section of place pages and on the data-centre project list.
- Every source named in the published data's metadata now maps to an entry in the dataset register, with a licence class and a permission status.
- One contact line, used by the terms, the privacy policy and the new pages.
- The data API has a published contract, version 1.1.0. The OpenAPI description at
/api/v1/openapi.jsonis generated from the tools and layers the server answers: every argument, the response and error fields, the headers, the key and the rate limit, and for each tool and layer whether it reads data licensed for non-commercial use only and what is withheld. The developers page says what stays stable and how changes are announced. - Every API response carries an
X-PatchWatt-APIheader with that version; tool calls and layer downloads also carryX-RateLimit-LimitandX-RateLimit-Remaining. - A tool argument of the wrong type is refused with a message naming it, as is a request body that is not a JSON object. Before, a flag sent as "yes" or a number sent where text was expected was quietly read as the default. A layer download asked for in a format other than geojson or csv is refused instead of answered as GeoJSON.
- The data centre's own (IT) cooling water can now be entered: a water usage effectiveness (WUE, litres per kWh of IT energy), with the IT load and its utilisation. With a WUE entered, the Water and cooling section, the report, the water licences tool and the workbook's inputs show the water a year beside the plant's cooling, marked "Your input". Without one it reads "Not included unless you enter it" (evidence Not known) and stays an open item. Before, it was always "Not included".
Default changes
- The defaults fingerprint started here at eb4b9d; a later default change must add an entry with its new fingerprint, or the tests fail.
- New inputs, no figure moved (eb4b9d → 0f4a27): data-centre cooling water's WUE, blank (not included unless you enter it: no stable primary Alberta source gives one, and The Green Grid's metric and the Lawrence Berkeley National Laboratory's 2024 report to Congress give no figure to use as a default); its IT load, the case's size; its utilisation, 100% of the IT load all year. No tornado row: the WUE moves no money figure, and no primary source states a low and high for it.
Live-test fixes, accuracy benchmarks and accessibility
The build the audit book tested. It was deployed more than once on 2026-11-19, and every deploy that day read "built 2026-11-19"; the figures below changed between those deploys, which is why the versions are now split.
Changes
- One calculation layer for a place, checked to give the same figures on the page, in reports, Compare, CSV exports and the API tools.
- Directive 011 cost areas derived from the AER PDF by a pipeline step; the hand-typed table is gone.
- Well capital from a depth and lateral formula fitted to operators' disclosures; Duvernay basins from the Alberta Geological Survey outlines; one central EUR for each well set.
- Power finance on the reference plant in Alberta's Market Power Mitigation Regulation; the returns headline leads with the forward case and the latest years.
- Liability counted by licence, with each well's depth and its township's cost area.
- Water-licence holders: names shown only for organisations and public bodies; individuals withheld everywhere.
- Accessibility: skip link, focus kept inside dialogs, chart data reachable by keyboard, named controls, text contrast.
Default changes
- Cost of capital 8.5% → 9.7% after tax, from the reference merchant plant in the Market Power Mitigation Regulation (Alta Reg 43/2024, Schedule: 10.5% pretax at 50% debt at 7% and 23% tax). The real rate for the cost of power moved 6.37% → 7.55%.
- Merchant debt 40% → 50% of capital at 7% (the same Schedule), with no coverage test by default (was 2.0×, which had no primary source).
- Engine capital C$1,630 → C$1,788/kW at 100 MW: the AESO 2024 Long-Term Outlook engine figure joined the published set and sets its median.
- Effect at Fox Creek (100 MW engines, merchant): project IRR over past years' lives P10 / P50 / P90 10.0 / 13.9 / 18.3% → 8.1 / 12.4 / 17.4%; forward case 16.0% → 14.4%; cost of power C$65–101 → C$67–108/MWh; self-supply median year 12.4% → 11.1%.
- Self-supply now leads with the AESO transmission tariff charged on gross load (12.4% at Fox Creek), with the tariff fully avoided (24.3%) shown beside it as the upside.
- Forward low and high power cases scale by the 25th and 75th percentiles over the years' mean (were the median): Fox Creek's high case fell from C$165.33 to C$115.28/MWh.
- Single-well economics at Fox Creek (25 km, P50, gross, 100% working interest), NPV at 10%, in the order the changes landed: C$10.51M (liquids priced, NGTL fuel and the abandonment surcharge charged; 2026-11-17) → C$6.45M: liquids prices are the 12-month mean like the gas price, no longer the latest month alone (September 2026 pentanes plus was a spike, C$810.57/m³ against a mean of C$645.73) → C$1.94M: capital and operating cost follow the play from operators' disclosures (Duvernay: C$12.7M and C$32/e3m3), replacing an unsourced C$8M, C$8,000 a month and C$20/e3m3 → C$4.24M: capital from the depth and lateral formula (C$11.10M at 3,085 m and a 3,608 m lateral) and the central case on the P50 well, since enough wells have their own decline fit.
Finance rebuild on the MSA dispatch method; security hardening
Changes
- Hourly dispatch against pool prices on the Market Surveillance Administrator's net-revenue method; it reproduces the MSA's 2025 results within 2% (combined cycle) and 8% (simple cycle).
- Finance as ranges: an IRR for each past year's prices held over the life, a forward case, a tornado and named scenarios; carbon cases with credits; debt by revenue type; capital cost allowance by class with losses carried forward; behind-the-meter tariff value.
- Supply and upstream: NGTL toll stack, Crown royalty, liquids prices, well economics with abandonment.
- Security: content security policy and headers, daily limits on the assistant, sanitized report HTML, least-privilege service account.
Default changes
- Engine capital, twice in one day. First the engine figures were pooled with aeroderivative turbines and raised by the turbines' post-2022 price step (1.71×), which put engine capital at C$3,388/kW at 100 MW and Fox Creek's median project IRR at 4.8% (from 13.2%). The same day the step was measured on the Fox Creek plant itself (Kiwetinohk's 2022 estimate against Bitdeer's 2025 figures for the same plant: 0.82×) and engines became their own set of four: C$1,630/kW, median IRR 4.8% → 13.7%, forward 6.6% → 16.4% (QA record "Engine capital basis corrected", 17 November 2026). The audit book read the live page's median as 2.9% and then 13.4% across this change; its figures differ from these QA runs by the other inputs in force on the page at the time, which were not reconstructed. Both changes are in commit e1f13e7, which gathers the work of 2026-11-14 to 11-17, so the history cannot separate them further.
- Operating reserves on by default for engines and aeroderivatives (+0.0 to +0.4 points of IRR at Fox Creek).
Canadian cost basis, overrides, accounts and the first Cloud Run release
Changes
- Cost of power in constant 2025 Canadian dollars at a real rate, restated with Statistics Canada price indexes; Canadian gas scenarios only (CER and AER), with the US Henry Hub as a reference line.
- The assumption registry: every default with its source, overridable with a stated reason, applied the same way in pages, reports and the API.
- Accounts (Firebase), saved work synced across devices, and the site moved to Cloud Run in Montréal behind Firebase Hosting.
- Drawn areas and any radius from 1 to 100 km.
- Back-test of the pre-screen against four filed Alberta projects: mean absolute error 40% → 26% after the fixes it found.
Default changes
- Cost defaults moved to the AESO Cost of New Entry study (2018): 8.5% cost of capital, 20-year life, lateral C$157k per inch-km, grid C$58.3/kW; meter station C$0 as a labelled assumption.
- Gas engines at 8.52 GJ/MWh (higher heating value) from Beacon's filing; combined-cycle build period 3.8 years (Cascade as built).
- The grid tie runs to the nearest substation in the voltage band or taps its nearest line, whichever is nearer; the gas tie-in is the nearest sales line at least as large as the plant's lateral.
App shell, object pages, reports, land and market data
Changes
- Sidebar navigation, search, place, well-set and operator pages, typed reports with a report builder, Compare, Watch.
- Land sales, AESO queue, AUC proceedings, GHG reporting, power plants, CER flows, land cover; outline import and export; wells hygiene, per-well fits, vintage, flow tracing, liability and spuds.
- A data updates page listing every dataset's source, date, licence and size.
First build
Changes
- Map of gas facilities, pipelines, grid, water and ground constraints around a site, with a site pack, screening grid, comparison, sizing and cost of power, producer netback and a printable report.