PatchWatt
Alberta’s gas, grid and land, in one place.
Alberta’s gas wells and plants, pipelines, the AESO grid queue, Crown land sales, operators and data-centre projects, joined up from public records. Pick a site to see whether a gas plant could work there: where its gas would come from, how far the grid is, what the power would cost. Or look up an operator, a well, or what’s proposed near you. Every figure is sourced, and every gap is listed.
For non-commercial use only: personal learning, teaching, academic research and the public. Not for business, client, paid, investment or transaction work of any kind; for commercial use, write to hello@patchwatt.com. Terms of use
Best on a computer: the map, screening and report builder need a wide screen. On a phone, try a site below and open the sample report.
Sign in
Save your sites, reports and assumptions to your account.
No account needed. You can sign in later and keep what you made.
For non-commercial use only. By signing in or continuing as a guest you agree to the terms of use and the privacy policy.
Try a site
Fox Creek, 100 MW
- 766MMcf/draw gas reported at facilities of 19 operators within 25 km; reported, not gas available to buyPetrinex volumetrics
- 19.4MMcf/da 100 MW plant would burn at full load (reciprocating engines)plant heat rate, AESO and filings
- about 1.1kmto the nearest sales-gas line, NGTL System, a CER route generalized to a few kmAER and CER pipelines
- 3.4kmto Fox Creek 741S, 138/144 kVAESO transmission map
- 87–128C$/MWhcost of power off-grid, scenario range (4 published gas outlooks × 5 published capital figures); about 1 C$/MWh more with a grid connectionlevelized, constant 2025 C$
Make the pre-feasibility report for this siteOpen the full site pageSee a finished example: Fox Creek, 100 MW (PDF)
Start here
- Pick a placeClick the map or search a town, legal land description or operator. Fox Creek above is a worked example.
- Read the evidence wordsNo site gets a score. Each answer says how much public evidence stands behind it:
- Sourced
- Public data answers this, with a named source and date.
- Partial
- Public data answers part of this; the rest is an open question.
- Not public
- The answer exists but is not published (e.g. grid capacity, a gas contract).
- Not known
- Public data used here does not settle this.
- Build one reportOn a place page, start a report: every section is saved with its source and date, ready to print or send.
One site, joined up
Other tools hold the data. PatchWatt connects it for the question you’re asking: can a plant here get its gas and reach the grid, and what would it take.
- Gas in the groundNamed operators' wells and plants nearby, how much they report, and how long it is likely to last.Petrinex, AER
- The plantWhat a plant of your size and type would burn, emit and cost to build and run.AESO, company filings, AUC
- The tie-inThe nearest sales-gas line, the lateral it would take, and the gas plants and corridors around it.AER, CER
- The gridSubstations by voltage, the AESO connection queue at each, and what is already asking for capacity.AESO
- The groundFlood, caribou, protected areas, First Nations and Métis lands, water basins, buildings and noise distance.Government of Alberta, NRCan
- The costCost of power across the published gas outlooks, with carbon under TIER, in constant 2025 dollars.CER, AER, TIER agreement
- The paperA report you can send, with every source cited and the questions public data leaves open listed.20 report types
Your numbers where you have better ones
Every default names its source: AESO’s cost of new entry study, the CER’s gas outlooks, company filings. Change any assumption, and the report shows your figure in place of the default. Where public data can’t settle something, the report lists it as an open question and says who can answer it.
The tools
- Sizing and cost
- Gas need, emissions and cost of power for any plant size and type, every input visible and changeable.
- Will the gas last
- Supply from nearby wells and plants, decline-fitted and checked against past years.
- Reports
- Pre-feasibility, shortlist memo, plant catchment, counterparty memo and 16 more, built from your sites.
- Operators
- Production, facilities, liabilities and legal events for any producer or counterparty.
- Screening
- Every part of Alberta that meets your criteria for gas, grid and land, on one map.
- Data-centre projects
- The projects tracked in Alberta, with their load, queue requests and the gas around them.
- Market
- Pool price, AECO gas, the AESO queue and Crown land sales; follow any of them on the Watchlist to see what changed.
- API, MCP and assistant
- The same tools from code, from Claude or any MCP client, or by asking in plain English.