PatchWatt

Alberta’s gas, grid and land, in one place.

Alberta’s gas wells and plants, pipelines, the AESO grid queue, Crown land sales, operators and data-centre projects, joined up from public records. Pick a site to see whether a gas plant could work there: where its gas would come from, how far the grid is, what the power would cost. Or look up an operator, a well, or what’s proposed near you. Every figure is sourced, and every gap is listed.

For non-commercial use only: personal learning, teaching, academic research and the public. Not for business, client, paid, investment or transaction work of any kind; for commercial use, write to hello@patchwatt.com. Terms of use

Best on a computer: the map, screening and report builder need a wide screen. On a phone, try a site below and open the sample report.

Try a site

Fox Creek, 100 MW

  1. 766MMcf/draw gas reported at facilities of 19 operators within 25 km; reported, not gas available to buyPetrinex volumetrics
  2. 19.4MMcf/da 100 MW plant would burn at full load (reciprocating engines)plant heat rate, AESO and filings
  3. about 1.1kmto the nearest sales-gas line, NGTL System, a CER route generalized to a few kmAER and CER pipelines
  4. 3.4kmto Fox Creek 741S, 138/144 kVAESO transmission map
  5. 87–128C$/MWhcost of power off-grid, scenario range (4 published gas outlooks × 5 published capital figures); about 1 C$/MWh more with a grid connectionlevelized, constant 2025 C$

Make the pre-feasibility report for this siteOpen the full site pageSee a finished example: Fox Creek, 100 MW (PDF)

Start here

  1. Pick a placeClick the map or search a town, legal land description or operator. Fox Creek above is a worked example.
  2. Read the evidence wordsNo site gets a score. Each answer says how much public evidence stands behind it:
    Sourced
    Public data answers this, with a named source and date.
    Partial
    Public data answers part of this; the rest is an open question.
    Not public
    The answer exists but is not published (e.g. grid capacity, a gas contract).
    Not known
    Public data used here does not settle this.
  3. Build one reportOn a place page, start a report: every section is saved with its source and date, ready to print or send.

One site, joined up

Other tools hold the data. PatchWatt connects it for the question you’re asking: can a plant here get its gas and reach the grid, and what would it take.

Your numbers where you have better ones

Every default names its source: AESO’s cost of new entry study, the CER’s gas outlooks, company filings. Change any assumption, and the report shows your figure in place of the default. Where public data can’t settle something, the report lists it as an open question and says who can answer it.

The tools

Sizing and cost
Gas need, emissions and cost of power for any plant size and type, every input visible and changeable.
Will the gas last
Supply from nearby wells and plants, decline-fitted and checked against past years.
Reports
Pre-feasibility, shortlist memo, plant catchment, counterparty memo and 16 more, built from your sites.
Operators
Production, facilities, liabilities and legal events for any producer or counterparty.
Screening
Every part of Alberta that meets your criteria for gas, grid and land, on one map.
Data-centre projects
The projects tracked in Alberta, with their load, queue requests and the gas around them.
Market
Pool price, AECO gas, the AESO queue and Crown land sales; follow any of them on the Watchlist to see what changed.
API, MCP and assistant
The same tools from code, from Claude or any MCP client, or by asking in plain English.

Built from AER, Petrinex, AESO, CER, ECCC, NRCan, Statistics Canada and Government of Alberta data and company filings, refreshed automatically; production through 2026-10, data built 2026-11-23. AER, Petrinex and AESO data are used for non-commercial purposes only. PatchWatt describes what public data shows; it is screening, not engineering advice.

Sources and data statusHow it worksTerms of usePrivacy